There were three energy audits completed covering multiple sites across the UK, including a portfolio of wind farms and two biomass facilities. These are complex operational environments involving turbine mechanics, thermodynamic systems, and energy generation processes.
Our auditing methodology included:
- Onsite inspections and desktop reviews Analysis of operational data and SCADA systems
- Thermodynamic efficiency assessments Evaluation of energy-consuming systems and processes
- Energy use and carbon emissions were broken down by asset type, with intensity ratios tailored to each organisation’s operational context.
Our ESOS Lead Assessor and audit team brought over a decade of experience in energy auditing and compliance, enabling a bespoke and technically robust approach.
Improvement opportunities were identified through data interrogation and technical analysis. These included:
- Heat recovery from biomass processes
- Procedural changes to turbine operations Enhanced monitoring and targeting systems
- Improved data collection protocols
Each opportunity was evaluated with anticipated savings and payback periods calculated. Nearly 6,000,000 kWh were identified, combined across the 3 Greencoat organisations.
Challenges included the complexity of efficiency measures for generation assets and the fact that the generation assets were already operating very efficiently. These were addressed through bespoke analysis to target areas for energy improvement, stakeholder engagement, and technical innovation.
Reporting The Assessment Findings and Evidence Pack
Findings were reported through comprehensive ESOS assessment reports for each business, which included:
- Executive summary and methodology Detailed site assessments
- Identified opportunities and recommendations
- Compliance checklist and sign-off documentation
The evidence pack included:
- Company Structure Review Site visit records
- Operational data analyses
- Total Energy Consumption Records
- Notification of compliance
The report was well received by each Greencoat Business, and has since led to further engagements within the group.
Future plans include:
- Implementation of identified opportunities through the ESOS Action Plans
- Annual reviews to track progress and refine strategies
- Continued partnership with our team for Phase 4 readiness
The groundwork laid in Phase 3 has positioned Schroders Greencoat for long-term energy efficiency and compliance success.