Services

From strategy to delivery, our experts support complex challenges across the entire lifecycle of a project.

  • Environment
  • Engineering
  • Planning Consultancy
  • Safety
  • Sustainability Consulting
  • Net Zero and Decarbonisation
Arboriculture & Forestry Consultancy Services
Acoustics, Noise & Vibration Consultants
Air Quality
Archaeology & Heritage
Contaminated Land & Remediation
Ecology & Biodiversity
Environmental Impact Assessment
Construction Environmental Management
Environmental Permitting
Flood Risk
Glint & Glare
Shadow Flicker Risk Assessment
Hydrology & Hydrogeology
Landscape & Visual
Waste
Soils & Peat
Explore Environment
Civil Engineering
Structural Engineering
Geotechnical Engineering
Temporary & Enabling Works
Process Engineering
Energy Engineering
Energy Analysis
Environmental Engineering
Water & Wastewater
Surveying
Asset Integrity
Explore Engineering
Planning Consultancy
Transport Planning
Explore Planning Consultancy
Process Safety Consultants
COMAH Compliance Consultants
DSEAR & ATEX Compliance Services
HAZOP Consultancy
Machinery Safety
Process Safety Training Consultants
Health & Safety
Occupational Hygiene Consultants
Construction Design & Management (CDM)
Explore Safety
Energy Compliance
Environmental, Health & Safety (EHS) Legal Compliance Management
ISO Management Systems Services
Sustainability Strategy, Reporting and Verification
Environmental, Social, Governance (ESG)
Sustainability Programme Delivery Support
Sustainability Skills and Training
Explore Sustainability Consulting
Product Carbon Footprint Consultants
Buildings & Infrastructure Carbon Footprint & Reduction
Net Zero Strategy & Climate Transition Plans
Carbon Verification & Assurance
Energy Generation Feasibility Design
Industrial & Commercial Energy Solutions
Public Sector Decarbonisation Solutions
Net Zero and Decarbonisation Training
Carbon Footprint & Reporting
Explore Net Zero and Decarbonisation

hello@arthian.com

+44 (0) 3301 200 151

  • Office Locations
  • Resources
  • Services
    • Public Sector
  • Sectors
  • Projects
  • About Us
  • Training
  • Careers
  • Insights
  • Contact Us

Services

  • Environment
  • Engineering
  • Planning Consultancy
  • Safety
  • Sustainability Consulting
  • Net Zero and Decarbonisation

Environment

  • Arboriculture & Forestry Consultancy Services
  • Acoustics, Noise & Vibration Consultants
  • Air Quality
  • Archaeology & Heritage
  • Contaminated Land & Remediation
  • Ecology & Biodiversity
  • Environmental Impact Assessment
  • Construction Environmental Management
  • Environmental Permitting
  • Flood Risk
  • Glint & Glare
  • Hydrology & Hydrogeology
  • Landscape & Visual
  • Soils & Peat
  • Waste
  • Shadow Flicker Risk Assessment

Engineering

  • Civil Engineering
  • Structural Engineering
  • Geotechnical Engineering
  • Temporary & Enabling Works
  • Process Engineering
  • Energy Engineering
  • Energy Analysis
  • Environmental Engineering
  • Water & Wastewater
  • Surveying
  • Asset Integrity

Planning Consultancy

  • Planning Consultancy
  • Transport Planning

Safety

  • Health & Safety
  • Occupational Hygiene Consultants
  • Construction Design & Management (CDM)
  • Process Safety Consultants
  • Process Safety Training Consultants
  • COMAH Compliance Consultants
  • DSEAR & ATEX Compliance Services
  • HAZOP Consultancy
  • Machinery Safety

Sustainability Consulting

  • Energy Compliance
  • Environmental, Health & Safety (EHS) Legal Compliance Management
  • ISO Management Systems Services
  • Sustainability Strategy, Reporting and Verification
  • Environmental, Social, Governance (ESG)
  • Sustainability Programme Delivery Support
  • Sustainability Skills and Training

Net Zero and Decarbonisation

  • Public Sector Decarbonisation Solutions
  • Industrial & Commercial Energy Solutions
  • Energy Generation Feasibility Design
  • Net Zero Strategy & Climate Transition Plans
  • Carbon Footprint & Reporting
  • Buildings & Infrastructure Carbon Footprint & Reduction
  • Carbon Verification & Assurance
  • Net Zero and Decarbonisation Training
  • Product Carbon Footprint Consultants
  • Services
    • Public Sector
  • Sectors
  • Projects
  • About Us
  • Training
  • Careers
  • Insights
  • Contact Us

  • Office Locations
  • Resources

hello@arthian.com

+44 (0) 3301 200 151

Planning for Carpenter’s Solar Farm
Home | Projects | Planning for Carpenter’s Solar Farm
Planning

Planning for Carpenter’s Solar Farm

Client

Centrica

Location

UK

The Challenge

A Local Wildlife Site (LWS) was identified as being partially located within the boundary of the proposed development site. Due to the ecological sensitivity and importance of the designation, further detailed survey work was required to fully assess potential impacts. This included the completion of a comprehensive botanical survey to establish the presence, extent, and condition of notable plant species and habitats within the LWS.  

Arthian Ltd. was commissioned by Centrica to prepare the submission of a planning application for the construction and operation of a proposed 0.999MW solar farm development with associate infrastructure. The Application Site was 2.35ha and located within the administrative boundary of High Peak Borough Council. 

 Arthian worked as a multidisciplinary team to deliver the following outputs: 

  • Planning Statement;  
  • Design and Access Statement;  
  • Landscape & Visual Appraisal;  
  • Preliminary Ecological Appraisal;  
  • Biodiversity Net Gain Report;  
  • Phase 1 Contamination Risk Assessment Report;  
  • Coal Mining Risk Assessment;  
  • Geotechnical Desk Study Report;  
  • Geotechnical Interpretive Report;  
  • Exploratory Phase II Site Investigation Report;  
  • Flood Risk & Drainage Assessment;  
  • Noise Assessment;  
  • Construction Environmental Management Plan;  
  • Construction Traffic Management Plan;  
  • Historic Environment Assessment; and  
  • Tree Survey Report 
Carpenter's Solar Farm 2
Carpenter's Solar Farm 3

The Solution

Particular care was taken in relation to the presence of the Local Wildlife Site (LWS), with the proposed landscape and ecological mitigation measures carefully designed to integrate sensitively within this area. This approach aimed not only to protect the existing ecological value of the LWS but also to enhance habitat connectivity and encourage increased biodiversity, rather than inadvertently constraining or degrading it. 

Our team coordinated and managed the entire planning process, overseeing a wide range of internal and external stakeholders and ensuring that all supporting technical documentation was prepared, reviewed, and submitted accurately and within the required timescales. All identified environmental, technical, and policy constraints were comprehensively considered and fully integrated into the site design and overall planning strategy. 

As a result of this structured and collaborative approach, planning permission for the solar farm was successfully secured in March 2025. 

Our Latest Projects

View All Projects
Planning for Carpenter’s Solar Farm
Planning

Planning for Carpenter’s Solar Farm

Read more
Planning Delivery for Temporary School Facilities
Planning

Planning Delivery for Temporary School Facilities

Read more
Planning for an Anaerobic Digestion Plant
Planning

Planning for an Anaerobic Digestion Plant

Read more

Get in Touch

We’d love to hear from you – whether you have a question, a project in mind, want to explore job opportunities, or just want to say hello.

Contact Us

 

Arthian Logo

Arthian is a trusted partner, working collaboratively to deliver client-focused solutions.

Join our newsletter

    hello@arthian.com
    +44 (0) 3301 200 151

    Office Locations

    • England
    • Ireland & Northern Ireland
    • Scotland
    • Wales
    Back to Top
    • Policies
    • HTML Sitemap

    LinkedIn

    © 2025 Arthian Ltd. All Rights Reserved | The name Arthian and the Arthian logo are Trade Marks licensed to Arthian Ltd. | 13 Henderson Road, Inverness, IV1 1SN. Registered in Scotland No. SC 163378

    Design & Build by Atomic Digital Marketing