Send an enquiry

    Privacy Policy

    Services

    From strategy to delivery, our experts support complex challenges across the entire lifecycle of a project.

    • Environment
    • Engineering
    • Planning Consultancy
    • Safety
    • Sustainability Consulting
    • Net Zero and Decarbonisation
    • Energy & Decarbonisation
    Arboriculture & Forestry Consultancy Services
    Acoustics, Noise & Vibration Consultants
    Air Quality 2
    Air Quality Assessment Services
    Indoor Air Quality Assessment Services
    View All Air Quality
    Archaeology & Heritage
    Contaminated Land & Remediation
    Ground Risk & Site Investigation 3
    Geoenvironmental Services
    Geotechnical Engineering & Ground Investigation Services 
    Contaminated Land & Geotechnical Engineering Services
    View All Ground Risk & Site Investigation
    Ecology & Biodiversity
    Environmental Impact Assessment
    Construction Environmental Management
    Environmental Permitting
    Flood Risk
    Glint & Glare
    Shadow Flicker Risk Assessment
    Hydrology & Hydrogeology
    Landscape & Visual
    Waste 1
    End of Waste
    View All Waste
    Soils & Peat
    Explore Environment
    Civil Engineering Consultants
    Bund Inspection, Assessment & Design
    Structural Engineering
    Structural Surveys Investigation and Monitoring 1
    RAAC Inspections & Structural Assessments
    View All Structural Surveys Investigation and Monitoring
    Geotechnical Engineering
    Temporary & Enabling Works
    Asset Integrity
    Process Engineering 1
    Distillery Design
    View All Process Engineering
    Energy Engineering
    Energy Analysis
    Environmental Engineering
    Water & Wastewater
    Surveying
    Explore Engineering
    Planning Consultancy
    Transport Planning
    Planning Application Assessments & Reports
    Explore Planning Consultancy
    Process Safety Consultants
    COMAH Compliance Consultants
    DSEAR & ATEX Compliance Services
    HAZOP Consultancy
    Machinery Safety
    Process Safety Training Consultants
    Health & Safety
    Occupational Hygiene Consultants
    Construction Design & Management (CDM)
    Explore Safety
    Environmental, Health & Safety (EHS) Legal Compliance Management
    ISO Management Systems Services 1
    ISO 14001
    View All ISO Management Systems Services
    Environmental, Social, Governance (ESG)
    Sustainability Programme Delivery Support
    Sustainability Skills and Training
    Explore Sustainability Consulting
    Product Carbon Footprint Consultants 2
    Environmental Product Declarations (EPDs)
    Lifecyle Assessment (LCA)
    View All Product Carbon Footprint Consultants
    Buildings & Infrastructure Carbon Footprint & Reduction 3
    Whole Life Carbon Assessment (WLCA)
    BREEAM Infrastructure Assessor and Consultancy
    PAS 2080 – Carbon Management in Infrastructure and Built Environment
    View All Buildings & Infrastructure Carbon Footprint & Reduction
    Carbon Verification & Assurance 1
    Airport Carbon Accreditation (ACA)
    View All Carbon Verification & Assurance
    Industrial & Commercial Energy Solutions
    Public Sector Decarbonisation Solutions
    Net Zero Strategy & Climate Transition Plans 2
    Carbon Reduction Plan
    Science-Based Targets
    View All Net Zero Strategy & Climate Transition Plans
    Net Zero and Decarbonisation Training
    Carbon Footprint & Reporting 2
    Carbon Footprint Calculation
    Streamlined Energy & Carbon Reporting (SECR)
    View All Carbon Footprint & Reporting
    Explore Net Zero and Decarbonisation
    Energy Generation Feasibility Design
    Energy Saving Opportunity Scheme (ESOS) Consultants 3
    Energy Saving Opportunity Scheme (ESOS)
    ESOS Phase 4 Compliance Consultants
    ESOS Action Plans
    View All Energy Saving Opportunity Scheme (ESOS) Consultants
    Explore Energy & Decarbonisation
    Request a Quote

    careers@arthian.com

    +44 (0) 3301 200 151

    • Office Locations
    • Resources
    Request a Quote
    • Services
      • Public Sector
    • Sectors
    • Projects
    • About Us
    • Training
    • Careers
    • News
    • Insights
    • Contact Us

    Services

    • Environment
    • Engineering
    • Planning Consultancy
    • Safety
    • Sustainability Consulting
    • Net Zero and Decarbonisation
    • Energy & Decarbonisation

    Environment

    • Environmental Permitting
    • Ground Risk & Site Investigation
    • Waste
    • Soils & Peat
    • Landscape & Visual
    • Hydrology & Hydrogeology
    • Glint & Glare
    • Flood Risk
    • Arboriculture & Forestry Consultancy Services
    • Construction Environmental Management
    • Environmental Impact Assessment
    • Ecology & Biodiversity
    • Contaminated Land & Remediation
    • Archaeology & Heritage
    • Air Quality
    • Acoustics, Noise & Vibration Consultants
    • Shadow Flicker Risk Assessment

    Engineering

    • Water & Wastewater
    • Civil Engineering Consultants
    • Civil & Structural Engineering
    • Asset Integrity
    • Surveying
    • Environmental Engineering
    • Energy Analysis
    • Energy Engineering
    • Process Engineering
    • Temporary & Enabling Works
    • Geotechnical Engineering
    • Structural Engineering
    • Flood Risk (FRA’s)
    • Drainage & SuDS
    • Structural Surveys Investigation and Monitoring
    • Bund Inspection, Assessment & Design
    • Integrated Nearshore, Landfall & Onshore Cabling Civil Engineering

    Planning Consultancy

    • Planning Consultancy
    • Transport Planning
    • Planning Application Assessments & Reports

    Safety

    • Health & Safety
    • Occupational Hygiene Consultants
    • Construction Design & Management (CDM)
    • Process Safety Consultants
    • Process Safety Training Consultants
    • COMAH Compliance Consultants
    • DSEAR & ATEX Compliance Services
    • HAZOP Consultancy
    • Machinery Safety

    Sustainability Consulting

    • Environmental, Health & Safety (EHS) Legal Compliance Management
    • Sustainability Programme Delivery Support
    • Environmental, Social, Governance (ESG) 6
      Climate Risks & Resilience Assessment
      Corporate Sustainability Reporting Directive (CSRD)
      Double materiality assessment
      ESG Programme Alignment
      Social Value Consultancy
      UN Sustainability Development Goals (UN SDGs)
      View All Environmental, Social, Governance (ESG)
    • Sustainability Strategy, Reporting and Verification
    • ISO Management Systems Services 2
      ISO 14001
      ISO 50001
      View All ISO Management Systems Services
    • Energy Compliance
    • Sustainability Skills and Training
    • Sustainability Strategy Development
    • Legal Registers & Legislative Updates
    • EHS Compliance Audits
    • Third Party Verification & Assurance
    • Sustainability Data Analysis
    • Resource Efficiency Audit & Action Plans
    • Environmental, Health & Safety (EHS) Compliance Support 
    • Circular Economy
    • TM44 Air Conditioning Inspections
    • Minimum Energy Efficiency Standards (MEES)
    • Energy Performance Certificates (EPC’s)
    • Display Energy Certificates (DEC’s)
    • Building Energy Compliance Assessments

    Net Zero and Decarbonisation

    • Industrial & Commercial Energy Solutions
    • Public Sector Decarbonisation Solutions
    • Carbon Footprint & Reporting 2
      Carbon Footprint Calculation
      Streamlined Energy & Carbon Reporting (SECR)
      View All Carbon Footprint & Reporting
    • Net Zero Strategy & Climate Transition Plans 3
      Carbon Reduction Plan
      Science-Based Targets
      Net Zero Strategy
      View All Net Zero Strategy & Climate Transition Plans
    • Carbon Verification & Assurance 1
      Airport Carbon Accreditation (ACA)
      View All Carbon Verification & Assurance
    • Buildings & Infrastructure Carbon Footprint & Reduction 3
      Whole Life Carbon Assessment (WLCA)
      BREEAM Infrastructure Assessor and Consultancy
      PAS 2080 – Carbon Management in Infrastructure and Built Environment
      View All Buildings & Infrastructure Carbon Footprint & Reduction
    • Product Carbon Footprint Consultants 4
      Lifecyle Assessment (LCA)
      Environmental Product Declarations (EPDs)
      Carbon Border Adjustment Mechanism Regulations (CBAM)
      Embodied Carbon Assessment (ECA)
      View All Product Carbon Footprint Consultants
    • Net Zero and Decarbonisation Training
    • Carbon Reporting & Disclosure
    • Task Force on Climate-Related Financial Disclosures (TCFD)
    • Scope 3 & Supply Chain Emissions
    • IWA 42 Net Zero Guidelines
    • ISO 14068 – Climate Change Management – Carbon Neutrality
    • GHG Verification & Assurance
    • GHG Emissions Inventory Management
    • CRREM Risk Analysis for Building Assets
    • Climate Transition Plans
    • Wind Energy Assessments
    • Solar PV
    • Public Sector Decarbonisation Support
    • Project Management for Renewable Systems
    • PAS 2038 Retrofit
    • Industrial Decarbonisation Strategy
    • Heat Recovery Solutions
    • Heat Pump Feasibility Design
    • Heat Network Design & Feasibility
    • Heat Decarbonisation Plans (HDPs)
    • Energy Efficiency Surveys
    • Detailed Design & Tender Specification and Project Management Support
    • Carbon Capture & Storage
    • Alternative Fuels & High Temperature Heat Pumps

    Energy & Decarbonisation

    • Energy Saving Opportunity Scheme (ESOS) Consultants 3
      ESOS Phase 4 Compliance Consultants
      ESOS Action Plans
      Energy Saving Opportunity Scheme (ESOS)
      View All Energy Saving Opportunity Scheme (ESOS) Consultants
    • Energy Generation Feasibility Design
    • Services
      • Public Sector
    • Sectors
    • Projects
    • About Us
    • Training
    • Careers
    • News
    • Insights
    • Contact Us

    • Office Locations
    • Resources

    hello@arthian.com

    +44 (0) 3301 200 151

    HAZID/HAZOP Consultancy
    Home | Services | Process Safety Consulting Services | HAZID/HAZOP Consultancy

    HAZID/HAZOP Consultancy

    Arthian’s consultants deliver HAZID and HAZOP studies to identify hazards, assess risks, and strengthen process safety. Practical, audit‑ready support tailored to complex operations.

    View All Process Safety Consulting Services Services
    Process Safety Consultancy HAZOP

    Process Hazard Identification & Operability Analysis

    Arthian delivers HAZID (Hazard Identification) and HAZOP (Hazard and Operability) studies to support the assessment and development of a safe and complaint design across high-hazard sector. These structured assessments help identify potential risks, operability issues and major accident hazards—ensuring compliance with COMAH, DSEAR and functional safety frameworks.
     
    We support:

       

    • Distilleries and drinks manufacturing
    • Chemical and pharmaceutical facilities
    • Energy from waste and renewables
    • Industrial gases, fuels and storage
    • High-risk manufacturing and processing sites

    What are HAZID and HAZOP Studies?

    A HAZID is a high-level, early-stage risk assessment that identifies potential hazards across systems, processes and site layouts. It’s typically used:

     

       

    • During concept or FEED stages
    • For new developments or major modifications
    • For ‘non process’ facilities such as warehousing and logistics
    • To screen for Major Accident Hazards (MAHs)
    • As part of COMAH safety report preparation

     
    We lead workshops that define hazard sources, assess risk pathways and recommend mitigation strategies—often forming the foundation for later HAZOP or LOPA studies.
     
    A HAZOP is a detailed, node-based assessment that evaluates how process deviations could lead to safety or operability issues. It’s used to:


       

    • Analyse process lines, vessels and control systems
    • Identify causes and consequences of deviations
    • Recommend safeguards and actions
    • Support LOPA, SIL and functional safety analysis

    Our HAZID and HAZOP Services

    We offer comprehensive HAZID and HAZOP services

    Technical Scribes and Documentation Support
    Use of Industry-Standard Software (e.g. PHA Pro, Bowtie XP)
    Integration with COMAH, DSEAR, OBRA and SIL Studies
    Action Tracking and Risk Ranking
    Remote or On-Site Delivery Across the UK
    hazid hazop

    Technical Scribes and Documentation Support

    We provide expert scribing and documentation services to ensure process safety studies are captured clearly, consistently, and in line with regulatory expectations.
     
    Our services include:

       

    • Professional scribing for HAZID and HAZOP workshops
    • Structured documentation of safety study outputs across disciplines
    • Support for auditability and regulatory compliance under industry standards
    • Clear records that enhance traceability and risk management

     
    Our approach ensures your safety assessments are well-documented, defensible, and ready for review by regulators and stakeholders.

    hazid hazop

    Use of Industry-Standard Software (e.g. PHA Pro, Bowtie XP)

    We leverage trusted, industry-recognised tools to ensure consistency, traceability, and quality in process safety documentation.
     
    Our capabilities include:

       

    • Use of PHA Pro for structured hazard identification and risk assessment
    • Application of Bowtie XP to visualise risk pathways and control measures
    • Delivery of high-quality outputs that support auditability and regulatory compliance
    • Integration of software outputs into broader safety and risk management frameworks

     
    By using proven platforms, we help teams streamline safety studies and enhance decision-making across complex projects.

    hazid hazop

    Integration with COMAH, DSEAR, OBRA and SIL Studies

    We ensure safety study outputs are fully aligned with wider regulatory frameworks, supporting compliance and operational integrity.
     
    Our services include:

       

    • Seamless integration of HAZID, HAZOP and risk analysis outputs into COMAH safety reports
    • Alignment with DSEAR requirements for hazardous substances and explosive atmospheres
    • Support for OBRA (Occupied Building Risk Assessment) to protect personnel and assets
    • Incorporation of findings into SIL (Safety Integrity Level) assessments for functional safety

     
    Our holistic approach ensures your safety documentation is consistent, defensible, and ready for regulatory scrutiny.

    hazid hazop

    Action Tracking and Risk Ranking

    We help clients move from safety study outputs to meaningful implementation by prioritising actions and managing risk effectively.

     
    Our services include:

     

    • Tracking post-study actions to ensure accountability and follow-through
    • Assigning risk rankings to support informed decision-making
    • Helping clients prioritise mitigation measures based on impact and feasibility
    • Providing structured outputs to support regulatory compliance and internal governance
    hazid hazop

    Remote or On-Site Delivery Across the UK

    Our services are available nationwide, with flexible delivery options to suit client needs—whether remote participation or on-site support is required.

    hazid hazop

    Technical Scribes and Documentation Support

    We provide expert scribing and documentation services to ensure process safety studies are captured clearly, consistently, and in line with regulatory expectations.
     
    Our services include:

       

    • Professional scribing for HAZID and HAZOP workshops
    • Structured documentation of safety study outputs across disciplines
    • Support for auditability and regulatory compliance under industry standards
    • Clear records that enhance traceability and risk management

     
    Our approach ensures your safety assessments are well-documented, defensible, and ready for review by regulators and stakeholders.

    hazid hazop

    Use of Industry-Standard Software (e.g. PHA Pro, Bowtie XP)

    We leverage trusted, industry-recognised tools to ensure consistency, traceability, and quality in process safety documentation.
     
    Our capabilities include:

       

    • Use of PHA Pro for structured hazard identification and risk assessment
    • Application of Bowtie XP to visualise risk pathways and control measures
    • Delivery of high-quality outputs that support auditability and regulatory compliance
    • Integration of software outputs into broader safety and risk management frameworks

     
    By using proven platforms, we help teams streamline safety studies and enhance decision-making across complex projects.

    hazid hazop

    Integration with COMAH, DSEAR, OBRA and SIL Studies

    We ensure safety study outputs are fully aligned with wider regulatory frameworks, supporting compliance and operational integrity.
     
    Our services include:

       

    • Seamless integration of HAZID, HAZOP and risk analysis outputs into COMAH safety reports
    • Alignment with DSEAR requirements for hazardous substances and explosive atmospheres
    • Support for OBRA (Occupied Building Risk Assessment) to protect personnel and assets
    • Incorporation of findings into SIL (Safety Integrity Level) assessments for functional safety

     
    Our holistic approach ensures your safety documentation is consistent, defensible, and ready for regulatory scrutiny.

    hazid hazop

    Action Tracking and Risk Ranking

    We help clients move from safety study outputs to meaningful implementation by prioritising actions and managing risk effectively.

     
    Our services include:

     

    • Tracking post-study actions to ensure accountability and follow-through
    • Assigning risk rankings to support informed decision-making
    • Helping clients prioritise mitigation measures based on impact and feasibility
    • Providing structured outputs to support regulatory compliance and internal governance
    hazid hazop

    Remote or On-Site Delivery Across the UK

    Our services are available nationwide, with flexible delivery options to suit client needs—whether remote participation or on-site support is required.

    Frequently Asked Questions

    What’s the difference between HAZID and HAZOP?

    HAZID is a high-level screening of potential hazards across systems and layouts. HAZOP is a more detailed study that examines how process deviations might lead to safety or operability issues.

    When is a HAZOP typically required?

    It’s most commonly carried out during detailed design or pre-commissioning stages, but can also support Management of Change and major modifications.

    Do you facilitate the studies and provide documentation?

    Yes—we lead workshops, document outcomes, and support clients with action tracking and study reports ready for internal use or regulatory submission.

    Can HAZOP findings support other safety assessments?

    Absolutely. HAZOP outputs often inform risk ranking, mitigation plans, and are used in preparing COMAH safety reports or other regulatory deliverables.

    Get in Touch

    We’d love to hear from you – whether you have a question, a project in mind, want to explore job opportunities, or just want to say hello.

    Contact Us
    Arthian Logo

    Arthian is a trusted partner, working collaboratively to deliver client-focused solutions.

    Join our newsletter

      hello@arthian.com
      +44 (0) 3301 200 151

      Office Locations

      • England
      • Ireland & Northern Ireland
      • Scotland
      • Wales
      Back to Top
      • Policies
      • HTML Sitemap

      LinkedIn

      © 2025 Arthian Ltd. All Rights Reserved | The name Arthian and the Arthian logo are Trade Marks licensed to Arthian Ltd. | 13 Henderson Road, Inverness, IV1 1SN. Registered in Scotland No. SC 163378

      Design & Build by Atomic Digital Marketing