Environmental Management for SSE’s Landmark Scheme
Client
SSE
Location
Scotland
Delivering bespoke environmental management, water supply protection, and real-time compliance tracking for one of Scotland’s most ambitious infrastructure projects.
SSE appointed Arthian to provide environmental support for the Beauly-Denny Overhead Line Scheme, a landmark infrastructure project spanning 220km across some of Scotland’s most remote and environmentally sensitive landscapes. The scale and complexity of the scheme were significant, with over 600 individual construction sites distributed along the route. Ensuring compliance with a wide range of environmental planning conditions and consents presented a major challenge, particularly given the diversity of habitats, land uses, and private interests affected by the works.
One of the most pressing challenges was the need to protect more than 250 private water supplies located along the route. Construction activities posed potential risks to these vital resources, requiring careful assessment and the implementation of robust control measures. In addition, the project demanded ongoing environmental monitoring and management, including regular audits and the tracking of actions across a vast and dynamic construction footprint. Effective communication and information management were essential to maintain compliance and respond to emerging issues in real time.
The Solution
Arthian responded by developing and delivering a comprehensive suite of environmental management services tailored to the unique demands of the Beauly-Denny project. A bespoke assessment methodology was created to evaluate the risks to over 250 private water supplies, ensuring that each site was individually assessed and that appropriate control measures were put in place to safeguard water quality throughout the construction period.
To maintain high standards of environmental compliance, Arthian conducted more than 100 audits across the project, systematically reviewing site practices and ensuring that all planning conditions and consent requirements were being met. A live/closed actions tracker was established and managed by Arthian, providing a centralised system for monitoring progress, addressing issues, and ensuring that corrective actions were implemented promptly.
Recognising the importance of effective information sharing, Arthian also designed and managed a project-wide environmental web portal. This platform enabled real-time communication and document management for all stakeholders, supporting transparency and facilitating rapid responses to environmental challenges as they arose.
Through this integrated approach, Arthian helped SSE to navigate the complex environmental landscape of the Beauly-Denny Overhead Line Scheme, ensuring that construction activities were carried out responsibly and in full compliance with all relevant planning and environmental requirements.